Location >> Home >> Business >> WPS
Contact us

kefloridina

kefloridina 500mg teampaula.azurewebsites.net

Address: Shanghai City, Yishan Road No. 889 Building No. 2, 1 floor

Telephone: 021-64858626, 021-64855758,

021-54246519

Fax: 02154260515

Contact person: Li Jiwen, Mao Feng, Xue Wei

Email:hjxh@shws.org

WPS
WPS
Published:2013-07-01 Hits:4877

We do WPS according to the standards below:

 

Chinese Standards.

 

JB4708 Steel pressure vessel welding procedure qualification

GB50236 Field equipment, industrial pipeline construction and pressure pipe welding procedure qualification

SY∕T0452 Oil and gas pipeline welding procedure qualification method

Steam Boiler Safety Technology Supervision (also for crane industry)

JGT81 Technical Specification for welding construction steel (also for highway and bridge)

SY∕T4103 (as well as API1104)

 

European Standards.

 

ISO15614-1 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys

ISO15614-2 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 2: Arc welding of aluminium and its alloys

ISO15614-3 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 3: Fusion welding of non-alloyed and low-alloyed cast irons

ISO15614-4 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 4: Finishing welding of aluminium castings

ISO15614-5 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 5: Arc welding of titanium, zirconium and their alloys

ISO15614-6 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 6: Arc and gas welding of copper and its alloys

ISO15614-7 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 7: Overlay welding

ISO15614-8 Specification and qualification of welding procedures for metallic materials -- Welding procedure test -- Part 8: Welding of tubes to tube-plate joints

 

American Standards.

 

AWS

D1.1/1.1M Structural Welding Code - Steel, Includes Errata

D1.2/1.2M Structural Welding Code - Aluminum

D1.3/1.3M Structural Welding Code - Sheet Steel, Fifth Edition, with Errata

D1.5/1.5M Bridge Welding Code (Joint Publication with AASHTO)

D1.6/1.6M Structural Welding Code - Stainless Steel

D14.3/14.3M Specification for Welding Earthmoving, Construction and Agricultural Equipment

 

ASME

 

Section IX Qualification Standard for Welding, Brazing, and Fusing Procedures

 

Copyright: 2011 Shanghai Welding Society Address: The ground floor, Building 2,  No. 889, Yishan Road, Shanghai Zip Code: 200433 Contact: Li Ji Wen; Xue Wei

Phone: +86-21-64858626, +86-21-64855758, +86-21-54246519 Fax: +86-21-54260515 technology support: Shanghai Weicheng